Baldwin Industrial Park

004 (2)

This park has been designated as a Shovel Ready site. It has been pre-approved by the City of Montpelier for tax abatement on real estate and equipment.

 

For more information, please contact:
Mayor Kathy Bantz
300 W. Huntington St. Montpelier, IN 47359
Ph. 765-728-6500
E-mail: mayorbantz@montpeliercity.net

Address

Montpelier Industrial Park
County Road 400 E, State Hwy. 18
Montpelier, Indiana 47359

Owner

City of Montpelier

Owner / Agent

N / A

Sale Price Quoted

Negotiable

Electrical Service

Indiana Michigan Power

Nearest Electrical Feed

Indiana Michigan Power currently serves electric power to the Montpelier Industrial Park from the Montpelier – Roll 12kV circuit. The station transformer, a 69/12 kV 12/20 M VA bank can take on another 12-15 MVA of load.

Sources and Percentages of Power (Hydro, Coal, Nuclear, Natural Gas, Wind, and Solar)

The natural gas distribution main is located approximately 4/10th of a mile north of this site. The gas distribution main is a four-inch steel line with 200 pounds per square inch pressure. Upon request for service, Vectren will extend without charge its facilities including distribution mains, underground gas service pipes, meters, and other equipment necessary to provide service, provided Vectren’s estimate of its Non-Gas revenue from such gas service for a period of five and one-half years is equivalent to or in excess of Vectren’s estimate of the cost for providing such facilities.

Nearest Fiber Line Location

BG Networking installed fiber optic lines to the industrial park.

Other Tenants in Vicinity

Naturally Recycled Protein is currently located in our Industrial Park and CreekRun, an environmental engineering firm, has an office building located on the southernmost parcel in the park. Central States Enterprises, a grain terminal, is located to the east of the Industrial Park. On the north side of the park, across State Hwy 18, are other industries, including Emhart Gripco, QEP Veneer, and Smith Consulting. Property to the west and south of the park is agriculture.

County

Blackford County, Indiana

Zoning 

Industrial

Description of Land Site

Phase one was completed in March 2006.  No further action required.

Current Taxes

N / A

Name and Distance of Nearest Substations (2)

The site is about 4,000 feet from the station, following the route of the Roll circuit. The circuit breaker in the station limits the circuit capacity to 12MVA, which leaves just under 7 MVA of available capacity. If a customer requires more than the available capacity, construction of infrastructure improvements can be underway in 90 days or less. There are no plans in the immediate future to build another station or add capacity. The transformer is only 50% loaded.

Approximate Power Cost ( $ / kWh)

$0.033/kWh

Proximity to Freeways

Adjacent to State Hwy. 18, 14 miles east of Interstate 69.

Proximity to Airport/Flight Paths

37 miles to Fort Wayne International Airport

Proximity to Rail Line

Rail to this park is not available